Year:2003
Status: Complete and approved by customer.
Objectives:
Pimp stations #1-4 detailed survey.

Condition check of

  • suction chambers and pipelines
  • ramps and ladders
  • stoplogs and their guidelines.

Sludge setting measurement. Inspecton of armored concrete structures.

Power pools #1 and #2 survey.

Inspection of fish protection structures and thrash-rack water intakes.

Summary:

All obectives was completed. A number of anomalies (concrete cracks, damaged metal elements, abnormal elements wear etc.) was found. Detailed report was submited to the customer.